Durable and available in engineered and solid options hardwood flooring is available in a variety of colors and install methods.
Time required lay hardwood flooring.
Join the ends of the boards over a floor joist where possible avoiding joints that form an h.
The subfloor and flooring should be tested with an appropriate moisture meter.
If you are installing the flooring below grade or in a room like a basement with high humidity or moisture lay down a vapor barrier before you install the flooring.
Installing hardwood floors with a few careful preparations elbow grease and a weekend you can have beautiful new floors.
Be sure to look for recommendations from the adhesive manufacturer.
The difference between the moisture content of the wood subfloor and the hardwood flooring must not exceed 4.
They should acclimate for at least 48 hours.
On average it takes 1 3 days to install hardwood floor.
If you ve decided to install engineered hardwoods there are four possible installation methods depending on the subfloor.
Install hardwood floors perpendicular to the floor joists parallel to the longest wall leaving a inch expansion gap around the perimeter.
Made from layers of real wood compressed together engineered hardwood floors are better able to handle changes in moisture and humidity than solid hardwood.
For hardwood products greater than 3 wide the moisture content.
Typically a 2 person crew of installers can lay 750 to 1 000 square feet of flooring per day with the average size of a job being 1 000 to 1 500 square feet.
Keep joints that line up at least two rows apart.
Glue nail staple and float.
If you re finishing wood floors on site you ll need to plan more time for the flooring to acclimatize as much as 5 7 days.
This will allow them to acclimate to the room s temperature and humidity.
The subfloor moisture level must not exceed 12.
Laying a solid hardwood strip floor is easier and faster if you choose a prefinished product to avoid the extra work of sanding staining and finishing.
Engineered floors are often installed using adhesives that have volatile organic compounds vocs that need to be evaporate prior to finishing.
It will take less time to install hardwood flooring if the space is smaller than 1 000 to 1 500 square feet.
Why it might be shorter.